Updated 12-1-14
OEET 115
Wiring
Bruce McDowell

Fall 2014
| Syllabus |
Recently added text is shown in a
larger font. The date when this page was updated is shown in the upper
right-hand corner.
|
| Type | Assignment No. |
Assignment Name | Max. Pts. |
Date |
Date |
Directions/Description |
| CE | pp. 3 & 4 | Wiring diagram | 20 | 8-25 | ||
| LR | NH27-30 | Wiring | 7 | 8-27 | ||
| LR | NH27-31 | Hallway switches | 15 | 8-28 | ||
| LR | NI08-30 | Romex wiring in mock-up room | 20 | 9-8 | Using Romex, wire up a switch and two receptacles. The middle receptacle should be always on, and the farthest one should be always off. | |
| LM | HI30-11 | Breaker box and five branches to wire up. | 10 | 9-10 | Right-click here and download. | |
| LM | GJ18-02 | Breaker box and five branches with faults. | 15 | 9-11 | Right-click here and download. | |
| CE | NI14-30 | Class exercise | 15 | 9-17 | ||
| CE | NI15-30 | Wire-fastening practice quiz. | 5 | 9-17 | Strip and fasten onto receptacles as many wires as you can (up to 8) during the allotted time. | |
| LM | FI20-30 | Breaker box and five branches with faults. | 15 | 9-17 | Right-click here and download. | |
| LR | Conduit bending (first exercise) | 5 | 9-18 | |||
| LR | FI22-30 | Mock-up room troubleshooting #1 | 7 | 9-22 | Use a meter to find out what's wrong with the wiring in the mock-up room. | |
| LR | NI22-30 | U-shaped conduit bend | 7 | 9-22 | ||
| LR | NI25-30 | Three switches controlling a light | 20 | 9-25 | Do in lecture room | |
| LM | G11-18 | Single-phase vs. three phase | 5 | 9-25 | Right-click here, download, run the simulation, and study it. Then, call the instructor over. | |
| LR | NI28-30 | 3-phase motor conrolled by a contactor and a switch | 30 | 9-28 | ||
| H | "Assign. 4" | Types of insulation | 20 | 10-6 | See whiteboard | Handout sheet 12 0212 |
| LR | Latching 5 V. relay | 20 | ||||
| LR | NJ05-30 | Start-stop buttons using a contactor | 35 | 10-6 | ||
| CE | Troubleshooting game | 10 | 10-8 | |||
| LR | Mock-up room troubleshooting #2 | 20 | 10-9 | |||
| LR | p. 53 | Missile launch controller using 5 V. relays | 20 | 10-9 | ||
| LR | p. 42 | Button light-switches using 5 V. relays | 25 | 10-9 | ||
| LR | NJ12-30 | Mock-up room conduit wiring | 50 | 10-13 | Handout sheet | |
| H | NJ12-31 | Read about conduit wiring. | --- | 10-13 | 10-22 10-27 (surprise quiz sometime after this date) | Reading:
|
| H | NJ22-30 | Read about photovoltaic systems. | --- | 10-22 | 11-05 (surprise quiz sometime after this date) | Reading: pp. 400-406 (Solar Photovoltaic Systems) |
| H | NEC Assignment 5 | Solar Power | 20 | 10-27 | See whiteboard | Handout sheet |
| LR | NJ28-30 | Solar power system design for
Cheyenne, Wyoming
|
40 | 10-29 | Get handout sheet. Use these links: |
|
| H | NK03-30 | Calculations | 40 | 11-3 | See whiteboard | Handout sheet |
| LR | LC13-28 | ON, OFF, and buzzer | 20 | 11-5 | Handout sheet | |
| LR | LD26-38 | Burglar alarm | 20 | 11-5 | Handout sheet | |
| H | NK09-30 | Videos to watch | 11-9 |
|
Watch the following two
YouTube
videos by clicking on the underlined links. |
|
| LM | JB24-39 | 3-phase furnace | 15 | 11-11 | Right-click here and download the Multisim file. | |
| LM | GC05-19 | Power factor correction | 10 | 11-11 | Handout sheet | |
| LM | LI28-33, -34 | Switch and relay logic | 5 | 11-16 |
|
|
| LM | LI05-35 | Switch logic | 20 | 11-16 | Handout sheet | |
| LM | LI12-31 | Conveyor system | 50 | 11-19 |
|
|
| LM | NL01-30 | Four switches and two motors | 40 | 12-1 | Handout sheet |
| Point
Total (including attendance points) |
Score |
| >= 455 | 100 |
| 400 - 454 | 90 |
| 375 - 399 | 85 |
| 355 - 374 | 80 |
| 335 - 354 | 75 |
| 320 - 334 | 70 |
| Score | Letter Grade |
| 95 - 100 | A |
| 90 - 94 | B |
| 70 - 89 | C |
| 60 - 69 | D |
| 0 - 59 | F |
Reference